Rebuild only the affected loads when execution breaks, with proof no constraint was violated
Build a baseline plan
Orders are already picked and known to the case. The verified Clarke-Wright
load builder proves every load legal before departure. Pick a scenario and build.
Route map
Regional DC Store
Plan summary
Loads (0)
Inject a disruption
A disruption hits after the trailers are staged. Only the affected loads are
rebuilt; every untouched load stays byte-identical.
Build a baseline plan first (Baseline tab).
-
Re-plan time (ms)
-
Untouched loads
-
Rebuilt loads
-
Re-verified
What happened
Inject a disruption to see the plan diff.
Changed routes: baseline (dashed) vs re-planned (solid)
Baseline (affected) Re-planned
Baseline plan
Loads not touched by the disruption stay exactly as they were.
Re-planned plan
Only highlighted loads changed; the rest are the same objects.
Inject a disruption to see fresh certificates for the changed loads.
Plan-level re-verification
Load certificates (changed loads only)
Every rebuilt load is re-checked against all six load rules. The full enumeration is the product, not just the failures.